Comprehensive professional expertise

Comprehensive professional expertise

Mastering challenges by daring to innovate.
Finding solutions

Finding solutions

The success of a project begins during the consultation.
Maximum precision

Maximum precision

Quality is in every detail. Find out first-hand.
What the experts said about us in 2010

What the experts said about us in 2010

What makes us compellingly different – actual statements m ...
Manufacturing & installation

Manufacturing & installation

They come to the job perfectly prepared. Precise joinery & s ...

Secondary school in Kissing

www.mskissing.de

Category: School
Construction time: construction phase I: August 2011 to December 2011, construction phase II (connecting structure) April 2012 to June 2012

The extensive modernization of the secondary school included measures to increase energy efficiency, optimize air-conditioning and improve fire protection.
 

Challenge:

New wall elements with integrated ventilation outlets and integrated solar protection were attached to an existing steel structure. The existing fixing points of the old façade were reused.

Innovation:

Expertise on the benefits of the TES façade: a high degree of prefabrication, high-precision manufacturing and a resultant optimized construction process thanks to exact planning beforehand came to bear here.

Solution:

Wooden-framed structural panels with fibre cement sections replaced the existing façade panels. The entire building was renovated in terms of energy efficiency.

Result:

An optically attractive school building. No overheated classrooms in summer and significantly less heat loss in winter owing to the outer shell’s improved energy performance. Climate protection - modern and innovative.

Transfer:

The major advantage of the timber-construction method is that it is more cost-effective with the same physical structural properties. Almost 20% was saved on costs owing to a simpler design and less preparatory work on the existing structure.

Project participants:

Planning
Gerhard Mach (graduate in engineering), Kissing – gmach@architekt-mach.de

Structural calculations 
Riegg Dillingen studio – info@riegg-dlg.de

Structural calculations for the facade
Lieb Obermüller + Partner, Munich – info@lop.de

Ventilation planning
Wolfgang Hartmann engineering studio, Neusäß-Westheim – info@ibw-hartmann.de

Construction of windows
Wipfler, Wörleschwang – www.wipfler-fenster.de

Details on the method used:
www.tesenergyfacade.com